The three-storey building with a flat roof was constructed in 1850. Two additional storeys have been added to the construction and have been marked by a wide ledge. The design of the front wall partly reproduces the historical appearance and architectural detail.

Baumit insulation system

Архітектор

TH Architekci - Tadeusz Hardt

Applicator

ALLINVEST Sp. z o.o., Firma Budowlana Marta Fujarczuk

Інвестор

"AKME" Zdzisław Wisniewski

Розташування

Wroclaw

Рік

2018

Категорії

Термореновація